AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป Thyssenkrupp Steel restarts blast furnace at Duisburg plant – Steel, Aluminum, Copper, Stainless, Rare Earth, Metal Prices, Forecasting

Thyssenkrupp Steel restarts blast furnace at Duisburg plant – Steel, Aluminum, Copper, Stainless, Rare Earth, Metal Prices, Forecasting

HVAC Expert October 10, 2021

Thyssenkrupp Metal (TKS) has put its No. 1 blast furnace back into operation at the Duisburg plant. The restart will acquire area just after a three-month break for a partial shipping, declared the German metal and flat steel producer.

MetalMiner focus on value types: Give your company leverage for a lot more value transparency, from company facilities, makers and parts suppliers. Discover the styles now.

Thyssenkrupp Metal furnace in Duisburg at total capability yet again

eyewave / Adobe Stock

Furnace, Detector Checks Important During Fire Prevention Week | KNIA KRLS Radio
Furnace, Detector Checks Important During Fire Prevention Week | KNIA KRLS RadioRead more

The furnace can now be operated at total ability. The furnace can produce 10,000 tons of pig iron per day or 3.65 million tons for every yr, TKS declared on Oct 4.

TKS decommissioned BF 1 at the beginning of July in get to have out the partial line. In this case, it remaining the outer entire body of the furnace intact. The former campaign lasted above 13 yrs, according to TKS.

Relining a blast furnace is affiliated with significant fees, as there is a surcharge for heat-resistant stones, which can contain graphite, carbon, aluminum oxide and silicon carbide.

The relining BF 1 will, even so, be the very last from TKS Europe. The team programs to exchange the furnaces with immediate-lowered iron units that will use green hydrogen by 2025.

The TKS key area in Duisburg can produce all-around 10 million tons of pig iron for each 12 months by using BF 1 as very well as BFs 2, 9 and 8, all of which have been relocated in the last 8 decades.

Duisburg also has two fundamental oxygen converters that can deliver up to 13 million tons of crude metal per year and forged them into slabs.

On-web page rolling mills roll the semi-finished product into plates, scorching-rolled and cold-rolled coils. Even more downstream, the plant can deliver each incredibly hot-dip galvanized and electrolytically galvanized sheet metal.

Get social with us. Follow MetalMiner on LinkedIn.

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh