AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป REOPENED: CSM closes BU building at La Plata campus to repair heating system, 16 classes will be relocated

REOPENED: CSM closes BU building at La Plata campus to repair heating system, 16 classes will be relocated

HVAC Expert March 1, 2022

UPDATE 3/1/2022: The College of Southern Maryland (CSM) announces the Business Building (BU) at its La Plata Campus is reopened and repairs to the building’s hot water boiler loop piping are complete. Employees will be returning to their workspaces as scheduled today. Students who have classes in the BU Building – 16 classes were impacted – will be notified by their professors about their class programming.

The College of Southern Maryland (CSM) announces it has closed the Business Building (BU) at its La Plata Campus to begin repairs to the hot water boiler loop piping that serves the building. Employees and classes will be relocated during maintenance work, which could take up to three weeks.

In addition, the heat will be turned off this evening in the BU, Administration Building (AD), the Campus Center (CC), and Center for Business and Industry (BI) while initial repairs get underway. The AD, CC, and BI buildings will remain open during normal business hours. The heat will be restored to these buildings Thursday afternoon. Faculty, staff, and students who remain in those buildings are encouraged to dress appropriately.

Business Building (BU) at CSM’s La Plata Campus

Palmdale Air Conditioning & Heating Is A Reputable HVAC Contractor In Palmdale, CA
Palmdale Air Conditioning & Heating Is A Reputable HVAC Contractor In Palmdale, CARead more

Students who have classes in the BU Building – 16 classes are impacted – will be notified by their professors where their classes will be held while the BU Building is closed. Faculty and staff who have offices in the BU Building should discuss office access, relocation, and telework options with their supervisor.

The CSM Facilities Management team discovered a leak in the central campus heating system that is warmed by a hot water boiler loop (non-domestic water) last week when steam was seen reaching the surface of the ground near the north entrance to the BU Building. Further inspections this morning allowed CSM to isolate the leak and start fixing the problem yesterday afternoon.

Like this:

Like Loading…

Related

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh