At its meeting on Monday, Powell Metropolis Council awarded a $ 875,875 contract to Rawhide Mechanical Inc. of Cody to swap the HVAC process at the Powell Aquatic Centre. The function involves replacing the roof dehumidifiers, sewer operate and replacing rusted doorway parts.
“I’ve listened to only great things about them as a company,” Mayor John Wetzel stated of Rawhide.
A few contractors, all from Wyoming, are bidding on the venture. Casper-primarily based Air Improvements offered $ 937,896 and Basin Mechanical, Inc., centered in Cody, offered $ 980,170.
The city experienced budgeted $ 800,000 for the project. Since the lowest bidder exceeds the spending plan, the council will have to vote on a funds alter in a future conference.
Get the job done on the Powell pool will be concluded the 7 days after the spring break.
“A whole lot of small children use the facility during the spring break,” reported town administrator Zack Thorington, including that individuals with PAC memberships will need to make adjustments to compensate for the center’s lost availability.
The present-day 11 calendar year old HVAC technique was not designed for the substances in the swimming pools, which are remarkably corrosive.
“Pools get started consuming themselves for chlorine as shortly as they go online,” Thorington mentioned at a spending budget conference in May well. The city’s engineers created the replacement methods to final extended than the originals that have been in spot when the facility opened in May 2010.
Following the assembly, Thorington stated the present-day methods use cooling coils for dehumidification. The more recent dehumidifiers are more of a hybrid method that employs dry outdoors air whenever possible. You also have advanced controls for monitoring.
“We really should use it longer,” mentioned Thorington.