AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป Pothole and asphalt repair continues through Saturday for Clays Ferry Bridge I-75

Pothole and asphalt repair continues through Saturday for Clays Ferry Bridge I-75

HVAC Expert May 21, 2022

The Kentucky Transportation Cabinet (KYTC) advises motorists that operations are scheduled for the Clays Ferry Bridge on Interstate 75. Corrective work is necessary which will include; restriping paint on the Southbound side, pothole patching and repairing asphalt at a bridge end. The Kentucky State Police will be assisting with traffic control.

Pothole and asphalt repair continues through Saturday for Clays Ferry Bridge I-75

Interstate 75 – North and Southbound• lane closures will be necessary between milepoints 96.9 and 98.3 through today, April 21. The center and right/slow lane will be closed today, April 21 through Friday, April 22 – 8 p.m. Thursday evening until 4 a.m. Friday morning

• Northbound – the center and right/slow lane will be closed Friday, April 22 through Saturday, April 23 – 8 p.m. Thursday evening until 4 a.m. Saturday morning• Northbound – the left/fast lane will be closed

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh