Horn Glass has obtained the buy to mend the cold repair of furnace 2 from Stoelzle Oberglas in its plant in Köflach, Austria.
The get was to repair the 93.75 m² conclusion-fireplace furnace with six forehearths for container glass generation.
After the fix, the plant will develop 270 tons of white glass for each day.
Horn is increasing the existing furnace and equipping it with new heating and security controls.
In addition, it will be equipped with a new melt strengthening plant, a new batch loader HVR 700F-2P and other furnace products.
Thanks to Covid-19 limits, the very first video meeting for coordination conversations with Stölzle Oberglas about cold repairs took spot soon soon after the get was placed.