AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป Billings landfill starts process to repair drop-off facility following January’s fire | Local News

Billings landfill starts process to repair drop-off facility following January’s fire | Local News

HVAC Expert March 15, 2022

Billings officials will start work with contractors and engineers to map out the needed repairs to the new drop-off facility at the Billings Regional Landfill after a fire earlier this year damaged the building. 

Council approved a work order Monday night that “is intended to evaluate and establish a limit of repairs, create a scope of work, coordinate with the city’s insurer for compliance and acceptance, and complete repair work to get the facility back into operation as soon as possible.”

Billings Public Works director Debi Meling explained the process used by her department that allows contractors and engineers to work together simultaneously to create the estimates and repairs.

The fire at the drop-off facility erupted in late January in the northwest section of the building where it did the most damage. Flames damaged the metal siding on the building, parts of the roof and elements of the facility’s HVAC system.

Toco Warranty Launches the First and Only Extended Auto Repair Coverage Offered Directly as an Employee Workplace Benefit Program
Toco Warranty Launches the First and Only Extended Auto Repair Coverage Offered Directly as an Employee Workplace Benefit ProgramRead more

People are also reading…

Landfill crews had been running a large shredder, grinding down a pile of furniture when the fire started. Bulky items like furniture are broken up and shredded before being placed in the landfill as way to efficiently utilize space.

While the landfill is still open to the public, the drop-off facility has been closed since the fire.

The drop-off facility opened just over a year ago as part of a $20 million project to improve solid waste management at the landfill and, specific to the drop-off building, to reduce much of the wind-blown garbage that’s long plagued the site.

The idea for an enclosed drop-off center was hatched in 2017 and included the 60,000 square-foot drop-off facility, a 10,000 square-foot maintenance building and new scales. Construction began in 2019 and was finished early last year.

Subscribe to our Daily Headlines newsletter.

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh