New York American H2o is investing $ 260,000 to replace 820 ft of getting older drinking water principal with a new 8-inch ductile iron pipe along Lancaster and Bristol Streets in Lynbrook. The job also replaces 20 company-owned house link traces and a hydrant.
“New York American Drinking water is fully commited to delivering excellent drinking water assistance to our consumers,” reported John Kilpatrick, director of engineering for NYAW, according to a push release. “These new revitalized h2o pipes will make sure our distribution system will be potent and effective for years to come.”
Do the job started off last week and is envisioned to acquire all around three weeks. All development work will take location involving 8 a.m. and 4 p.m. Sections of the highway that are now getting developed may well be shut to visitors during doing work hrs. NYAW will coordinate with people in close proximity to the development web-site to limit disruption.
The closing highway rehabilitation is staying accomplished by the village of Lynbrook as section of a highway building job.
The utility firm advises pedestrians and motorists to be mindful about workplaces. Any resident with issues or inquiries about the planned operate is encouraged to call the NYAW Buyer Assistance Heart at (877) 426-6999.