AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป DTEK plans to repair 6 TPP power units by end of heating season

DTEK plans to repair 6 TPP power units by end of heating season

HVAC Expert January 26, 2023

Within 82 days before the end of the heating season, DTEK intends to repair six more power units of thermal power plants (TPPs) in addition to the four already repaired since the beginning of the autumn-winter period.

“We have already repaired four TPP units, and in these 82 days we plan to repair six more units to ensure reliable power generation,” the company said on Telegram on Tuesday.

The energy holding also clarified that since the beginning of the full-scale invasion, the company’s repair teams have resumed electricity supply for 6.7 million Ukrainians.

As reported, during the first half of the heating season, or in 90 days, the energy holding managed, in addition to restoring equipment after shelling, to repair four power units of thermal power plants, put eight new longwalls into operation, and also supported not only its own, but also state-owned thermal power plants with fuel by shipping them 120,000 tonnes of coal at the end of 2022.

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh