AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home » New Village Hall HVAC Units A $1 Million Expense For Mount Prospect

New Village Hall HVAC Units A $1 Million Expense For Mount Prospect

HVAC Expert January 4, 2023

By

Journal Staff
|
on
January 03, 2023

Mount Prospect Village Hall. (Journal photo)

After more than 15 years in operation, Mount Prospect Village Hall’s five rooftop HVAC systems will be replaced for just over $1 million.

Global HVAC Pumps, Boosters and Heat Exchangers Market 2020 -Industry Dynamic, Demand Analysis, Statistics, Trends and Opportunities to 2025 – KSU
Global HVAC Pumps, Boosters and Heat Exchangers Market 2020 -Industry Dynamic, Demand Analysis, Statistics, Trends and Opportunities to 2025 – KSURead more

The systems are original from 2004 and have met their designed life expectancy. Functionality, energy efficiency and overall condition necessitates the replacement, village officials said.

Earlier this summer, the village hired Baxter & Woodman engineering consultants to conduct a study of the current condition of heating and cooling systems at village hall. The firm was also tasked with identifying a preferred replacement alternative.

The final recommendation was to replace all of the existing rooftop units with higher capacity, ruggedized, energy efficient units installed at a higher elevation in the rooftop pits to facilitate greater air circulation and reduce downtime due to overheating.

The recommendation includes installation of a light colored roof membrane in the rooftop pit, replacement of all variable air volume control boxes (VAV boxes), and installation of building automation systems (the current system has no HVAC automation).

On Sept. 20, the village board awarded a contract to Valdes Engineering to prepare bid documents, oversee the bidding process and provide construction management services for the replacement of five rooftop units, replacement of the existing single ply roof membrane, retrofit 51 variable air volume boxes with new controls and to provide an alternate bid for the installation of an air purification system.

Village trustees Dec. 20 approved spending $1.049 million with Cahill Heating and Air Conditioning to complete the work. Replacement of the systems is expected to occur next summer.

 

Support local news by subscribing to the Journal & Topics in print or online.

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh