AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home » Roofs and HVAC work part of long-range plans for H-F High

Roofs and HVAC work part of long-range plans for H-F High

HVAC Expert November 11, 2022

The District 233 school board will be looking at some major expenditures over the next five years to keep the Homewood-Flossmoor High School buildings in good shape.

Chief School Business Official Lawrence Cook walked the school board’s Finance Committee members through a list of projects and projected costs at the committee’s meeting Nov. 1. He estimated spending $1.2 million yearly on repairs to roofs and the heating and cooling system.

H-F roofs are replaced on a rotating basis. The board agreed to replace the roof over the South Building cafeteria . . .

You have reached content available exclusively to Homewood-Flossmoor Chronicle digital subscribers.

Bluon Launches BluonLive, Connecting Local HVAC Distributors to Bluon’s Massive Community of HVAC Technicians
Bluon Launches BluonLive, Connecting Local HVAC Distributors to Bluon’s Massive Community of HVAC TechniciansRead more

Receive a 3-day free trial of unlimited digital access.

Already a subscriber? Login here.

 

 

 

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh