AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Menu
  • Home
  • AC Repair
  • Air Conditioning
  • HVAC
  • Furnace Repair
  • Heating Repair
  • TERMS AND CONDITIONS
  • PRIVACY POLICY
  • CONTACT US

Home ยป Crabaugh Hall Offline for HVAC Project in Spring 2022

Crabaugh Hall Offline for HVAC Project in Spring 2022

HVAC Expert December 18, 2021

Image of Crabaugh Hall ATU

Upgrades to the heating, ventilation and air conditioning systems in Crabaugh Hall at Arkansas Tech University in Russellville will require the facility to be closed through the spring 2022 semester.

ATU College of Education administrative offices — including the Office of Teacher Education Support Services, the Office of Licensure Support Services and finger printing — will be housed in Dr. Robert Charles Brown and Jill Lestage Brown Hall room 406 for the duration of the project.

ATU College of Education faculty will work from remote offices. Face-to-face classes in the ATU College of Education will take place in Brown Hall until Crabaugh Hall re-opens. All phone numbers and e-mail addresses remain the same.

Toshiba signs up for HVAC & R show
Toshiba signs up for HVAC & R showRead more

ATU College of Education faculty will be accessible through their phone, Webex and e-mail for face-to-face appointments.

Learn more about the ATU College of Education at www.atu.edu/education.

Prev Article
Next Article

About The Author

HVAC Expert

Recent Posts

  • Is Central Air Gas Or Electric
  • Hvac Cost Per Square Foot
  • How Does Ac Freeze Up
  • How Does Central Air Work In Apartments
  • How To Clean Hvac Unit

AIR CONDITIONING SERVICING

AIR CONDITIONING SERVICING DAILY
Copyright © 2025 AIR CONDITIONING SERVICING
Theme by Air Conditioning Servicing

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh